Key Advantages
- Compact footprint
- Reduced loads
- Efficient trip times
- ESG awareness integration
- Competent crewing and leadership
- Robust management system
- Advanced performance monitoring
Pressure Tests, Kill &
Bleed Off Systems
• Test pump & fluid for testing
• Pump, bleed off tank & lines
• Certified iron packages include coflex hoses
• Kill pump and fluid management options
Well Control
• 6 station closing unit with backup and
remote panels located in work basket
• Snubbing packages available
• Extensive secondary (snubbing)
accumulator system integral
• Extensive primary bop system and
accumulator support packages
• 7-1/16” to 13 5/8” stack designs
• Shear ram included in all stack designs
for 7 1/16” and 13 5/8” bops
Equipment Highlights
• 340K Hydraulic Workover Unit/Snubbing Unit:
- 12’ stroke
- 7-1/16” or 13-5/8” configurations available
- Heavy duty capacity gin pole with counterbalance winches
• Quinta plex 1000HP Skid-Mounted Pump:
- 3" x 6" stroke
- 15,000 psi WP
• 13 5/8” x 10' work window
• Serva SPM 600:
- 3” x 6” stroke
- 15,000 psi WP
- Heavy duty capacity gin pole with counterbalance winches
• 460,000 lb rated substructure with stair towers
• Trailer mounted doghouse & generator
• Self contained fluid management system
Job / Project Planning
The initiative for proper planning and execution utilizes our internal representations of 3D imaging, P&ID and BOP stack rendering, and Site layout. These tools allow proper representation to our customers of end results for equipment placement and organization.
